Wood, a global leader in consulting and engineering, has secured a contract from HD Hyundai Heavy Industries for detailed engineering of the topsides facilities on Woodside Energy’s Trion Floating Production Unit (FPU) in Mexican waters of the Gulf of Mexico. When complete, Trion will have a production capacity of 100,000 barrels per day and connect to a 950,000-barrel capacity floating storage and offloading vessel.
John Day, president of oil, gas, and power at Wood, comments, “We are pleased to have been selected as the topsides engineering provider for Trion by Woodside Energy and the project’s EPC Contractor, HD Hyundai Heavy Industries. Wood’s innovative design process on the pre-FEED and FEED work positioned us well for the detailed engineering scope on Trion.
“Applying a practical approach to decarbonization in the design process has been an important part of this project, while ensuring safety and quality. Our team has a proven history with Woodside, having worked together for two decades, and our experience designing and delivering solutions for Trion will improve productivity, reduce emissions, and maximize the return on investment for our client.”